Question: What is the purpose of a Xenium Analyzer Readiness Test and how can I perform it?
Answer: The Readiness Test verifies that all systems are working optimally and the instrument is ready to use. No reagents are used; the Readiness test is the only dry run the instrument utilizes. The Readiness test is run prior to every Xenium Analyzer run during the system checks step, but can also be initiated from the Menu > Readiness Tests screen at any time. For information on the readiness test, please refer to the Xenium Analyzer User Guide.
Products: Xenium Analyzer